Skip to content

Dam Construction

We are 100% Employee Owned

SCROLL DOWN

Dam Services

Staab Construction has years of dam repairs, new construction, and site logistics work. This includes Cranberry Water Control Structures, private & municipal dams, cofferdams, flow division, reverse gravel filters, toe drains, new and repaired dam gates and seals, and all often dam components. We have professional Engineers with experience with Army Corps of Engineer, US Fish & Wildlife, Wisconsin DNR, and often Government agencies. We understand the challenge of dam construction and we can see your project through from beginning to end.

a dam

TEAM BUILD

  • Building Division Manager
  • General Project Managers
  • Building Division Coordinators/ Estimators
  • Carpenters
  • Cement Finishers
  • General Laborers
  • Heavy Equipment Crane Operators
A Dam

CERTIFICATIONS & TRAINING

  • Confined Space Entry
  • OSHA 30 Hour
  • Journeymen Card Holders
  • NCCO Crane Operator
A Dam

KEY EQUIPMENT

  • 70 To 90 Ton Lattice Cranes
  • 40 To 50 Ton Hydraulic Rough Terrain Cranes
  • 21 Tn Mobile Hydraulic Truck Crane
  • Telehandlers & Forklifts
  • Symons Forming Systems
  • River Barges

Areas of Expertise

  • Cofferdams
  • General Demolition
  • Heavy Concrete
  • Precast Concrete
  • Shored Decks
  • Concrete Dams
  • Control Structures
  • Spillways
  • Flow Division / Bypass pumping
  • Dam Gates & Seals (new & repair)
  • Trash Racks
  • Rip Rap
  • Steel Sheet Piling
  • Diver Coordination
  • Remove Gravel Filters
  • Metal, FRP, Wood, Plastics, & Composites Specialties

Client Testimonial

I want to thank you, Kevin and the other guys for all of the work that was done out there and on this project. They were great to work with. I appreciated how Kevin thought ahead to make sure things were coordinated. He communicated the conflicts he saw and questions that he had to make sure that we were getting the product that we wanted. It was a lot of design/build on his part and he had a great vision to make it all happen. The site looked great when he was done with it. We could not be happier with how well this project turned out and how quickly it was done.

Melissa Arnot | P.E. | Kenosha Water Utility