City of Greeley-Water Pollution Control Facility
Provide fabricated exterior stainless steel and interior carbon steel blower piping. Pipe sizes ranged from 12 – 36” in carbon steel and 6 – 36” stainless steel. Multiple pipe offsets in an already tight room made for tight fabrication tolerances.
CLIENT | Hydro Construction in Greeley Colorado |
DURATION | 2018 |
SERVICES | Fabricated 304L Stainless Steel and Carbon Steel Pipe |
ENGINEERING FIRM | Stantec |
![Mechanical water system](https://www.staabco.com/wp-content/uploads/2021/08/Greenly-1-1024x576.jpg)